Yesterday, we received pictures of the next construction phase of our new Engine/Tanker. In our previous story, they were to start cutting and bend the metal for the body fabrication. This week, they began putting all of the pieces of the body together and should be ready to set the body on the chassis by the beginning of next week (11/16/15). Also, the poly-tank has arrived at the 4-Guys plant. Here are the latest pictures.
Passenger side upper body wall.
The driver side upper body wall is staged behind the passenger side upper body wall.
The lower body section (upside-down).
Supports for lower body section. Once the lower body section is upright, the bottom of the poly-tank will rest on these supports.
View of upside-down drivers side lower body.
Fender-well storage components.
Body fabrication is moving along quickly at the 4-Guys plant.
3000 gallon poly-tank (UPF). The holes are for plumbing and storage. The square on the side is one of the dump chutes. The square (with blue tape) on the end of the tank is for the direct tank fill connection.